Frame inspection in Berwick

At frame stage the structure of the house is open to view, from the slab edge to the roof trusses. It is the most important visit on most Berwick builds.

  • Frame and trusses up, roof on, wraps not yet fitted
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quoteSend your details and a Berwick inspector rings you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage3 of 7
When to bookFrame and trusses up, roof on, wraps not yet fitted
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Berwick frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Berwick builds

Larger Berwick homes lean on engineered parts: girder trusses, steel beams, posts and bolted connections. That is where our major findings sit, from packers under girders to bolts smaller than the engineering asks for.

What we find at this stage in Berwick

  • Packers under girder trusses not rated for the load
  • Bolts in engineered connections undersized
  • Bottom plates overhanging the slab edge
  • Roof brace splices too short
  • Posts split by coach screws
  • Loadbearing junctions cut for plumbing
Loadbearing wall junction weakened where it was cut back for plumbing, found during a frame inspection in Berwick
Loadbearing wall junction weakened where it was cut back for plumbing
Sample findings

Sample defects found during our frame inspections in Berwick

Annotated findings from Frame inspections.

Cement sheet packers under a girder truss, a material not rated for that load, found during a frame inspection in Berwick
Cement sheet packers under a girder truss, a material not rated for that load
Bolt in an engineered connection measured smaller than the engineering asks for, found during a frame inspection in Berwick
Bolt in an engineered connection measured smaller than the engineering asks for
Bottom plate hanging past the slab edge by more than the allowed tolerance, found during a frame inspection in Berwick
Bottom plate hanging past the slab edge by more than the allowed tolerance
Roof brace joined with a short overlap and too few fixings at each end, found during a frame inspection in Berwick
Roof brace joined with a short overlap and too few fixings at each end

The other stages of a Berwick build

  1. Bored piers inspection in Berwick1Bored piersHoles bored and cages set, before any concrete
  2. Slab pre-pour inspection in Berwick2Slab pre-pourPre-pour, with pods, steel and formwork still open
  3. Lock-up (pre-plaster) inspection in Berwick4Lock-up (pre-plaster)Windows, cladding and external doors in, before plaster
  4. Fixing inspection in Berwick5FixingJoinery, doors and trims in, painter booked next
  5. Waterproofing inspection in Berwick6WaterproofingMembrane applied and cured, tiler not yet started
  6. Pre-handover (PCI) inspection in Berwick7Pre-handover (PCI)Around a week before practical completion

All construction stage inspections in Berwick →

Guides

Construction stage guides for Berwick

All guides →

Book a frame inspection in Berwick

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Berwick: common questions

Why do packers under a girder truss matter?

A girder carries other trusses. Cement sheet packers are not rated to take that point load, so the support may crush over time.

How do you check a bolt size?

We measure the installed bolt with calipers and compare it with the engineering detail for that connection.

What overhang is allowed at the slab edge?

Generally no more than 10mm under the bottom plate. Beyond that the plate is not bearing fully on the slab.

Do you inspect the trusses themselves?

Our frame visit covers how trusses are supported, fixed and braced. The truss supplier is responsible for the truss design.

Which standards apply?

AS 1684 for timber framing and AS 4055 for wind loads, alongside the engineering for your lot.

Can these be fixed easily?

At frame stage, usually. Once plaster and ceilings are up, most require removing linings.

CallGet a Free Quote