A slab is checked once, in the hours before the pour. After that, the steel, the pipes and the barrier underneath are sealed in concrete for good.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
On Berwick waffle slabs we keep recording the same group of items: steel too close to the form face, mesh touching service pipes, bar chairs missing and beams narrowed where pods were knocked out of place.

Annotated findings from Slab pre-pour inspections.




1Bored piersHoles bored and cages set, before any concrete
3FrameFrame and trusses up, roof on, wraps not yet fitted
4Lock-up (pre-plaster)Windows, cladding and external doors in, before plaster
5FixingJoinery, doors and trims in, painter booked next
6WaterproofingMembrane applied and cured, tiler not yet started
7Pre-handover (PCI)Around a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
It is how much concrete sits between the reinforcement and the outer face of the slab. Too little and the steel can rust and burst the concrete over time.
A 25mm gap lets concrete fully surround both. Contact leaves a weak spot and a route for corrosion.
They hold the steel at the right height so it sits where the engineer placed it in the slab depth.
We look for collars and barriers at penetrations and whether the durable notice is in the meter box.
Yes, but most of what matters is then hidden. Pre-pour is the useful visit.
Same day in most cases, so the builder can act before the concrete arrives.