Trims, doors and cabinetry are in and painting is next. Items caught now get fixed before paint hides them.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
On Berwick fixing visits the external items stand out: a kitchen window with no flashing and no support beneath it, framing left bare at the fascia and balconies with no edge protection.

Annotated findings from Fixing inspections.




1Bored piersHoles bored and cages set, before any concrete
2Slab pre-pourPre-pour, with pods, steel and formwork still open
3FrameFrame and trusses up, roof on, wraps not yet fitted
4Lock-up (pre-plaster)Windows, cladding and external doors in, before plaster
6WaterproofingMembrane applied and cured, tiler not yet started
7Pre-handover (PCI)Around a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
Infill and trim still leave gaps around windows, so missing flashing and support are visible before sealant and paint hide them.
It is a safety hazard on any site with an open balcony, and we report it straight away.
Cappings installed flat or bent so they hold water rather than shedding it.
Where tiling is done, we look at sealing and finish. The membrane itself belongs to the earlier stage.
Around two hours for a typical double storey home.
You do, and you choose when to pass it to the builder.