The house is now closed to the weather. Before plaster goes on, it is the last chance to see sarking, fixings and services inside the walls.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Berwick lock-up visits often find the sarking missing between garage and house, tears in the building wrap and wall junctions that still need fixing. Our clients here book this stage more than any other.

Annotated findings from Lock-up (pre-plaster) inspections.




1Bored piersHoles bored and cages set, before any concrete
2Slab pre-pourPre-pour, with pods, steel and formwork still open
3FrameFrame and trusses up, roof on, wraps not yet fitted
5FixingJoinery, doors and trims in, painter booked next
6WaterproofingMembrane applied and cured, tiler not yet started
7Pre-handover (PCI)Around a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
It completes the weather barrier around the house, so moisture and draughts stay out of the living areas.
Tears let wind-driven rain reach the frame and reduce the wrap's insulating effect, so they should be taped before cladding closes them in.
A loose mixer is easy to secure through open framing. After tiling, the fix means taking tiles off.
No. We look at fixing and position only. Testing belongs to the licensed trades.
Allow an hour or two on a typical Berwick house.
We check the frame report items again and list any still open.