Berwick Building
Inspections

Up in the roof at a Berwick handover

The handover items you only find with a ladder and a torch.

Berwick 3806 · 3 February 2026

In short: Many of the most serious handover items in Berwick were in the roof space or at roof junctions, not in the rooms.

Flashings at roof junctions

We have recorded a roof junction with no flashing at all, leaving a direct path for water into the wall.

Bracing splices

Speed brace joints need to be spliced to the detail. A wrong splice weakens the bracing that holds the roof square.

Leftover timber and nails

Loose offcuts with nails sticking out are a hazard to anyone who goes up there later.

Access hatches

Pipes and ducts are sometimes run across the manhole, blocking safe entry for future trades.

Why this belongs in the report

Once you have the keys, getting the builder back into the roof is harder. List it now.

Written by our local inspection team from work carried out in Berwick. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More pci / handover guides for Berwick

All guides →

Book a building inspection in Berwick

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Berwick owners ask about this

Will you go into every roof space?

Where it can be entered safely. Where it cannot be entered safely, the report records that.

Is debris in the roof a defect?

Loose timber with exposed nails is a safety item and should be removed.

How serious is a missing flashing?

Serious, because it lets water into the structure.

Who fixes bracing?

The builder, to the truss or engineering detail.

CallGet a Free Quote