Which stage inspections a Berwick build actually needs
Matching the visits to a large, engineered home rather than booking all seven by habit.
In short: Seven stages exist. On a typical Berwick double storey, three or four of them carry nearly all the risk.
Start with the frame
Engineered framing is where Berwick's major items appear, so it is the first visit to keep.
Then pre-handover
It is your last inspection before you accept the home and pay the final claim.
Add waterproofing for several bathrooms
Each wet area adds a membrane, niche and water stop. One visit before tiling covers them all.
Slab where budget allows
Cover, clearances and chairs are checked once only, before the pour.
Piers on sloping lots
Where the engineering calls for piers, their position against the beams is worth a separate visit.
Lock-up and fixing
Useful on bigger builds, and the stages our Berwick clients rebook most often.
Written by our local inspection team from work carried out in Berwick. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.